Migration and cutover

Who signs the go/no-go?
The plan is not the spreadsheet. The plan is what happens when the third rehearsal fails at two in the morning and somebody has to decide. We rehearse end to end, time the rollback, and publish who makes the call before the weekend starts.

What is in it

Five capabilities, and one named decision-maker per phase.

Cutover design

Phased around your calendar and your window, not around the architecture. The window sets the unit of work.

Rehearsal

End to end against production-shaped data. Three of them, and the second is the one that matters.

Rollback, executed

Run, timed and signed off. Not a paragraph in a document that nobody has tested under load.

The night itself

One named decision-maker per phase, published in advance, awake and in the room.

Hypercare and exit

A support period with a stated end, and a handover that happens on that date rather than drifting.


Three rehearsals

The first finds faults. The third is theater. The second is the one that changes the plan.

The second rehearsal is where authority gets tested

By the second run the sequence survives, so people stop testing the steps and start testing what they are allowed to decide. That is when somebody says out loud that they are not sure whose call it is. They only ever say it once, so if you skip the second rehearsal you never hear it.

The go/no-go criteria

CriterionWho owns it
Data reconciliation inside toleranceYour data lead
Rollback timed inside the windowUs
Third rehearsal's open items closedJoint
Downstream consumers confirmedYour integration lead
Support rota staffed and awakeUs
The named decision-maker presentNamed before the weekend

Questions we are always asked

Four of them, answered the way we answer them on the phone.

Who makes the go or no-go call?

One named person per phase, published before the weekend and awake for it. The most common failure on the night is not a technical one — it is that nobody knew who was allowed to decide.

What if a rehearsal fails?

That is what rehearsals are for. The first finds faults, the second tests whether the authority holds when something goes wrong, and the third should be dull. A cutover whose rehearsals were all clean has not been rehearsed hard enough.

Do you rehearse the rollback too?

Executed and timed, not written down. A rollback that exists only as a paragraph in a document is a hope with a heading on it.

How long do you stay afterwards?

Through hypercare and out on a date agreed before the cutover, not a date negotiated after it. Staying indefinitely would be good for us and bad for you.